Peshawar Bus Rapid Transit Project
Desember, 2016
This preliminary design report is the third report produced by the consultant for the PPTA work. Prior to this report, an inception report and interim report were submitted to the ADB. The inception report was submitted in April 2016 and shows the BRT corridor alignment options, the existing public transport services (routes and frequencies), public transport demand as well as the Transit-Oriented Development (TOD) concept surrounding the BRT project.